It's a New Day in Public Health.
The Florida Department of Health works to protect, promote, and improve the health of all people in Florida through integrated state, county, and community efforts.
Enter one or more keywords to search the Florida Department of Health website.
Note that '*' and '?' wildcards are supported.
Search results for: septic in all categories
438 results found.
Refine your search by category:
- Web Pages (126)
- Documents (PDF, Word, etc.) (312)
44 pages of results.
Falkenburg AWTP Expansion – Oral Presentations [Documents (PDF, Word, etc.)]
... - scale treatment systems were installed at various residential sites in Florida, operated on septic tank effluent (STE) under actual onsite conditions, and monitored over an ...
44237-001C003_Task_A7_A8_A9.docx [Documents (PDF, Word, etc.)]
... aeration Extended aeration Heterotrophic Pulse aeration 2 with recycle back to suspended growth8 Recirculating media septic tank Heterotrophic packed filters3 Recirculating media bed fixed film Typical beds with recycle Sequencing ...
Progress Report 10 [Documents (PDF, Word, etc.)]
... completed on June 4, 2010. Task A.16 Materials Task Florida additive rule for septic system None N/A Testing for FDOH Complete products, evaluation of limestone ...
Agenda for the Research Review and Advisory Committee for the Bureau of On... [Documents (PDF, Word, etc.)]
... Committee Members and Alternates: In person: Sam Averett (alternate, Septic Tank Industry) Tom Higginbotham (alternate, Division of Environmental Health) ...
e4g.pdf [Documents (PDF, Word, etc.)]
... , Real Estate Profession) Wayne (W.B.) Crotty (member, Septic Tank Industry) Paul Davis (member, Division of Environmental Health) ...
Task B QAPP Recommendation for Process Forward Minutes [Documents (PDF, Word, etc.)]
... ? Response: Vendor systems will be installed by vendor recommendations. Question arose whether septic tank contractors will install systems? Yes, a licensed septic tank contractor will ...
Progress Report 12 [Documents (PDF, Word, etc.)]
... completed on June 4, 2010. Task A.16 Materials Task Florida additive rule for septic system None N/A Testing for FDOH Complete products, evaluation of limestone ...
GCREC Mound Instrumentation Progress Report 2 [Documents (PDF, Word, etc.)]
... data, the average background conductivity is 118.4 μS and pH is 5.1 while the septic tank effluent conductivity is 823.2 μS and pH is 6.8. Sampling and analysis ...
b1b.pdf [Documents (PDF, Word, etc.)]
... ith an on-site wastewater treatment system? a Yes O Na Did you receive any septic system user information? a Yes a Na Did you receive the as-built drawing ...
44237-001R007 Final Task A25 Cover [Documents (PDF, Word, etc.)]
... Nitrogen Reduction Strategies Study includes the evaluation of passive treatment systems to remove nitrogen from septic tank effluent. The Passive Nitrogen Removal Study II (PNRS II) is ...
Search took 0.153 seconds
Contact: Florida Health
- 850-245-4444
- health@flhealth.gov
-
Mailing Address
Florida Health
4052 Bald Cypress Way
Tallahassee, FL 32399
Connect with DOH
Florida Department of Health